The Short Columbia Utility Project will be replacing aging Sewer and Water lines in the Short Columbia Neighborhood. This project will be split into two phases for construction with the first Phase starting in the summer of 2025 and Phase 2 happening at a later date. Phase 1 will provide for the replacement of approximately 500 linear feet of 8” PVC sewer main and side sewer connections, new 1” water service connections, two (2) Storm Filter water quality units, and approximately 200 feet of storm pipe and accompanying fittings, structures, bases, asphalt, and other accompanying structure along the alley between Sams St. and Madison St. The Alley will be repaved with a centerline gutter pan to improve drainage along this roadway.
Phase 2 of the project will replace the Water main and Sewer along Sams St, Short Columbia St, and Arthur lane and will also include sidewalks, re-profiling of the roadway, and new improved Storm drainage.
Contact Us
Mathew Busch, PE
Senior Engineer
mbusch@monroewa.gov
Phone: 360-863-4535